Design and construction progress of BRIF

Design and construction progress of BRIF

作     者:ZHANG Tian-Jue GUAN Xia-Ling CUI Bao-Qun 张天爵;关遐龄;崔保群

作者机构:China Institute of Atomic Energy 

基  金:Supported by NSFC (10125518) 

出 版 物:《Chinese Physics C》 (中国物理C(英文版))

年 卷 期:2010年第34卷第1期

页      码:103-111页

摘      要:A new RIB project, the Beijing Radioactive Ion-beam Facility (BRIF), has been running at CIAE since 2004. In this project, a 100 MeV H-cyclotron, CYCIAE-100, is selected as the driving accelerator providing a 75-100 MeV, 200-500 μA proton beam. An ISOL system employs two stage separators to reach the mass resolution of 20000. Its RIB beam will be injected into the existing Tandem and a superconducting booster installed down stream of the Tandem will increase the energy by 2 MeV/q. The progress of BRIF, giving special emphasis to CYCIAE-100, will be introduced in this paper.

主 题 词:cyclotron main magnet RF cavity ISOL QWR superconducting cavity 