文献详情 >Reflections on the Three Gorges Pro... 收藏
Reflections on the Three Gorges Project since Its Operation

Reflections on the Three Gorges Project since Its Operation

作     者:Shouren Zheng 

作者机构:Changfiang Water Resources CommissionMinistry of Water ResourcesWuhan 430010China 

出 版 物:《Engineering》 (工程(英文))

年 卷 期:2016年第2卷第4期

页      码:389-397页

摘      要:*** The initial design of the Three Gorges Project(TGP)planned for three phases in the impoundment of its reservoir:the power generation period,with the water retained by a cofferdam;a preliminary operation period;and then a normal operation *** 2003,the Three Gorges Reservoir was impounded to elevation(El.)135 m,and power generation began with the water being retained by a *** 2007,the reservoir was impounded to El.156 m,and preliminary operations *** 2009,as the main hydraulic structures were completed,the reservoir was fit to be impounded to its normal level of El.175 ***,it was still kept at the pool level during the preliminary *** on considerations of the resettlement progress,observed results of sedimentation at the reservoir tail area,the influence of sedimentation on Chongqing Port,and so forth,the duration of the preliminary operation period was determined at six ***,in 2013,the Three Gorges Reservoir was impounded to its design pool level of El.175 m;hence,the normal operation period began.

主 题 词:工程实施 三峡 工程科学 工程设计 

学科分类:081504[081504] 080801[080801] 0808[工学-自动化类] 08[工学] 0815[工学-矿业类] 

核心收录:

D O I:10.1O16/J.ENG.2016.04.002

馆 藏 号:203213301...