Dynamic time-cost-quality tradeoff of rockfill dam  construction based on real-time monitoring

Dynamic time-cost-quality tradeoff of rockfill dam construction based on real-time monitoring

作     者:Deng-hua ZHONG Wei HU Bin-ping WU Zheng LI Jun ZHANG 

作者机构:The State Key Laboratory of Hydraulic Engineering Simulation and Safety Tianjin University Tianjin 300072 China 

基  金:Project supported by the Innovative Research Groups of the National Natural Science Foundation of China (No. 51621092)  the National Basic Research Program (973 Program) of China (No. 2013CB035904)  and the Natural Science Foundation of China (No. 51439005) 

出 版 物:《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 (浙江大学学报(英文版)A辑(应用物理与工程))

年 卷 期:2017年第18卷第1期

页      码:1-19页

摘      要:Time, cost, and quality are three key control factors in rockfill dam construction, and the tradeoff among them is important. Research has focused on the construction time-cost-quality tradeoff for the planning or design phase, built on static empirical data. However, due to its intrinsic uncertainties, rockfill dam construction is a dynamic process which requires the tradeoffto adjust dynamically to changes in construction conditions. In this study, a dynamic time-cost-quality tradeoff (DTCQT) method is proposed to balance time, cost, and quality at any stage of the construction process. A time-cost-quality tradeoff model is established that considers time cost and quality cost. Time, cost, and quality are dynamically estimated based on real-time monitoring. The analytic hierarchy process (AHP) method is applied to quantify the decision preferences among time, cost, and quality as objective weights. In addition, an improved non-dominated sorting genetic algorithm (NSGA-II) coupled with the technique for order preference by similarity to ideal solution (TOPSIS) method is used to search for the optimal compromise solution. A case study project is analyzed to demonstrate the applicability of the method, and the efficiency of the proposed optimization method is compared with that of the linear weighted sum (LWS) and NSGA-II.

主 题 词:Dynamic time-cost-quality tradeoff Rockfill dam construction Real-time monitoring Decision preferences 