看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Design & Construction Progress and ... 收藏
Design & Construction Progress and Prospect of TGP

Design & Construction Progress and Prospect of TGP

作     者:ZHENG Shou-renChief Engineer, Changjiang Water Resources Commission, Wuhan 430010, China ZHENG Shou-ren

作者机构:Chief Engineer Changjiang Water Resources Commission Wuhan 430010 China 

出 版 物:《人民长江》 (Yangtze River)

年 卷 期:2002年第33卷第Z1期

页      码:2-6页

摘      要:The construction of the TGP has proceeded smoothly since its commencement of construction in 1994 and the construction quality is good in general. The construction proceeds in accordance with the master project schedule in preliminary design approved by the central government and the investment can be controlled within the total budget of the preliminary design. The Changjiang Water Resources Commission, taking charge of the general design jobs of the TGP, has consistently paid attention to the project quality in the first place and carried out large amount of investigation, design and scientific research work. This paper makes an overall summarization and presentation on important technical issues in the design, such as dam, powerhouse structure, permanent ship locks, ship lift, project safety monitoring, main river closure and the 2nd stage cofferdam, mechanical and electric design etc., and put forwards a lot of suggestions about optimizing design schemes and measures for smoothing away construction difficulties in accordance with construction progress.

主 题 词:hydraulic structure electromechanical equipment technical design construction progress safety monitoring Three Gorges Multipurpose Project 

学科分类:0202[经济学-财政学类] 02[经济学] 020205[020205] 

D O I:10.3969/j.issn.1001-4179.2002.z1.002

馆 藏 号:203320989...

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分