看过本文的还看了

正在加载...

相关文献

正在加载...

该作者的其他文献

正在加载...
文献详情 >The design of Three Gorges Hydropow... 收藏
The design of Three Gorges Hydropower Station

The design of Three Gorges Hydropower Station

作     者:Zhou Shuda Xie Hongbing 

作者机构:Changjiang Institute of Survey Planning Design and Research Changjiang Water Resources Commission Wuhan 430010 China 

出 版 物:《Engineering Sciences》 (中国工程科学(英文版))

年 卷 期:2011年第9卷第3期

页      码:66-73页

摘      要:Using physical model and numerical simulation techniques, some technical problems were studied systemati- cally, including layout of power station, measures of sediment and floating debris discharging, types of intake, embed- ded types of spiral ease, layout of underground powerhouse tunnel group and block reinforcement. It was optimal in technique and economy with the arrangement of powerhouse at the dam-toe of both banks + underground powerhouse in the right bank, as well as the intake with a single and small orifice. The sediment and debris problems could be solved with disperse sediment ejection and floating debris discharging holes. With the adoption of techniques for spiral cases such as heat and pressure preservation, cushion layer and combined embedding, the stable operation of generating units can be guaranteed. The arrangement of tailrace tunnel with sloping ceiling was better than that of tailrace surge tank. The technical requirements related to the embedding type of spiral case were proposed. The reinforcement of huge unfavorable blocks was discussed and the new idea for block reinforcement using anti-sliding piles and normal compressive stress of structural plane was put forward.

主 题 词:Three Gorges Power Station layout sediment and floating debris discharging spiral case embedding shallow embedment block reinforcement 

学科分类:081504[081504] 080801[080801] 0808[工学-自动化类] 08[工学] 0815[工学-矿业类] 

馆 藏 号:203402039...

读者评论 与其他读者分享你的观点

正在加载...
用户名:未登录
我的评分 12345