Design and implementation of model test installation of heave compensation system of deepsea mining
作者机构:School of Mechanical and Electrical EngineeringCentral South University State Key Laboratory of Deep Sea Mineral Resources Development and Utilization TechnologyChangsha Research Institute of Mining and Metallurgy
基 金:Project(50675226) supported by the National Natural Science Foundation of China Project(DYXM-115-04-02-01) supported by the Eleventh Five-Year Plan of China
出 版 物:《Journal of Central South University》 (中南大学学报(英文版))
年 卷 期:2011年第18卷第3期
页 码:642-649页
摘 要:In order to validate the simulation model and develop heave compensation control strategy,heave compensation model tests were *** model test installation includes themining ship motion simulator,the heave compensation system,the lifting pipe simulator,the buffer simulator and the water *** tests ofmining ship motion simulator show that it is able to perform under the predetermined attitude path smoothly and can meet the requirements of themining ship *** heave compensation effect is more than 60% under random wave and the goal is set to be 50%.The model test results indicate that this heave compensation system is effective and feasible.
主 题 词:deepsea mining heave compensation model test installation mining ship motion simulator gimbal
学科分类:081901[081901] 0819[工学-海洋工程类] 08[工学]
核心收录:
D O I:10.1007/s11771-011-0742-2
馆 藏 号:203650830...