看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Key technologies, engineering manag... 收藏
Key technologies, engineering management and important suggestions of shale oil/gas development: Case study of a Duvernay shale project in Western Canada Sedimentary Basin

Key technologies, engineering management and important suggestions of shale oil/gas development: Case study of a Duvernay shale project in Western Canada Sedimentary Basin

作     者:LI Guoxin LUO Kai SHI Deqin LI Guoxin;LUO Kai;SHI Deqin

作者机构:PetroChina Exploration&Production CompanyBeijing 100007China CNPC S&T DepartmentBeijing 100007China CNPC Oilfield Service Company LimitedBeijing 100007China 

基  金:Supported by the Key Intergovernmental Special Project on International Science and Technology Innovation Cooperation(2016YFE0102400) 

出 版 物:《Petroleum Exploration and Development》 (石油勘探与开发(英文版))

年 卷 期:2020年第47卷第4期

页      码:791-802页

摘      要:The Duvernay project in Canada was taken as an example to summarize the advanced technology and engineering management model of shale oil and gas development in North *** suggestions were put forward to accelerate the commercial development of domestic continental shale oil and *** advanced technologies,valuable knowledge and rich experience were introduced,including the evaluation of geological target area of the project,rapid long horizontal drilling and completion,high-intensity fracturing,and well spacing *** particular,the concept and connotation of the full-life cycle management of North American unconventional resource projects were *** emphasis on early evaluation and risk management,and a highly competitive market environment have played an important role in promoting technological innovation and management *** addition,the low-cost sharing system of industry-wide knowledge and experience and the management mode were *** management approaches are of great significance for reference in accelerating the exploration and development of unconventional resources in *** possesses abundant shale oil and gas resources,which are an important replacement to guarantee the national oil and gas energy ***,due to the late start and special geological characteristics and engineering difficulties in China,there is a large gap in technology level and management mode compared with North *** to the advanced experience and enlightenment of the shale oil and gas development in North America,a preliminary proposal to accelerate the development of shale oil and gas in China was made.

主 题 词:shale oil and gas long horizontal well high-intensity hydraulic fracturing full-life cycle management large scale exploitation 

学科分类:0820[工学-航空航天类] 0202[经济学-财政学类] 02[经济学] 020205[020205] 08[工学] 082002[082002] 

核心收录:

D O I:10.1016/S1876-3804(20)60094-5

馆 藏 号:203952651...

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分