限定检索结果

检索条件"主题词=model test"
5 条 记 录,以下是1-10 订阅
视图:
排序:
Factors affecting thin coal seam shearer drum coal-loading performance by a model test method
收藏 引用
《Journal of Central South University》2019年 第6期26卷 1619-1636页
作者:GAO Kui-dong XU Wen-bo JIANG Shou-bo DU Chang-longCollege of Mechanical & Electrical EngineeringShandong University of Science and TechnologyQingdao 266590China Jiangsu Key Laboratory of Mine Mechanical and Electrical EquipmentChina University of Mining and TechnologyXuzhou 221116China 
To solve the problem of a low coal-loading rate being exhibited by the drum shearer on Chinese thin coal seams,systematic tests and research were performed to study the pivotal factors’influences on drum coal-loading...
来源:详细信息评论
Design, Calculation and model test of Zhongshan Bridge
收藏 引用
《Journal of Southwest Jiaotong University(English Edition)》2004年 第1期12卷 49-55页
作者:李永河 张俊平 黄道沸School of Civil Engineering Guangzhou Municipal Design and Research Institute 
Zhongshan Bridge is a kind of steel arch bridge with a particular space-combined structure. The rationality of design, accuracy of theoretical calculation and reliability of transportation were studied. Its design, FE...
来源:详细信息评论
Research on dynamic characteristics model test scheme for middle pylon of multi-pylon multi-span suspension bridges
收藏 引用
《Engineering Sciences》2012年 第3期10卷 64-71页
作者:Zhang Yufeng Zhang DachangJiangsu Transportation Research Institute Co. Ltd. Nanjing 211112 China Highway Bridge Engineering and Technology Research Center of Jiangsu Province Nanjing 211112 China Key Laboratory in Communications Industry for Health Testing and Diagnosis of Long and Large Bridges Nanjing 211112 China Nanjing University of Technologies Nanjing 210018 China 
Multi-pylon multi-span suspension bridge is a new type super flexible structure system, and the rigidity design of middle pylon is one of the main difficult technical issues. Due to the requirements of longitudinal ri...
来源:详细信息评论
Deformation mechanism and treatment technology research of coal pillars in acute inclined goafs under expressway
收藏 引用
《Applied Geophysics》2025年 第1期22卷 161-175,235页
作者:Bao Wei-Xing Ma Zhi-Wei Lai Hong-Peng Chen RuiSchool of HighwayChang’an UniversityXi’an710064Shaanxi ProvinceChina CCCC FIRST HIGHWAY CONSULTANTS CO.LTDXi’an710075Shaanxi ProvinceChina 
When the expressway crosses the goafs inevitably,the design is generally to build the road on coal pillars as much as ***,the existing coal pillars are often unable to meet relevant requirements of highway *** three-d...
来源:详细信息评论
model tests on uplift capacity of double-belled pile influenced by distance between bells
收藏 引用
《Journal of Central South University》2022年 第5期29卷 1630-1640页
作者:SUN Tao CUI Xin-zhuang SUN Yan-feng HAN Ruo-nan MA Rui-jin YANG Jun-jie WANG Yi-lin CHANG Yu-junSchool of Earth Science and EngineeringShandong University of Science and TechnologyQingdao 266590China School of Civil EngineeringShandong UniversityJinan 250061China Shandong Yellow River Reconnaissance Design&Research InstituteJinan 250013China University of RedlandsRedlandsCalifornia 92373USA School of Environmental Science and EngineeringOcean University of ChinaQingdao 266100China Ruiyuan Engineering Group Co.Ltd.Qingdao 266555China 
To optimize the distance between the bells in pile design,this paper reports a series of small scale tests on the uplift capacity of double belled piles embedded in dry dense sand considering different bell space *** ...
来源:详细信息评论
聚类工具 回到顶部