T=题名(书名、题名),A=作者(责任者),K=主题词,P=出版物名称,PU=出版社名称,O=机构(作者单位、学位授予单位、专利申请人),L=中图分类号,C=学科分类号,U=全部字段,Y=年(出版发行年、学位年度、标准发布年)
AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
范例一:(K=图书馆学 OR K=情报学) AND A=范并思 AND Y=1982-2016
范例二:P=计算机应用与软件 AND (U=C++ OR U=Basic) NOT K=Visual AND Y=2011-2016
摘要:It is well known that the overbreak caused by the blasting damage during tunnel excavation increases costs associated with filling the collapsed area with shotcrete and results in filing of a claim by the contractor. This paper outlines a new approach for prediction the overbreak depth during tunnel construction. Hence, firstly excavation damage zone(EDZ) are determined by average specific charge in each zone. Numerical modelling is used to simulate the EDZ around tunnel boundary and the overbreak depth are calculated by the rock strength factor. The predicted overbreak depth compared with observed field data from a case study. The results show that there exists an approximately up to 40% difference between the prediction and the observed volume of overbreak depth. Therefore, the method can be well used to predict the overbreak depth to estimate more precision of shotcrete and concrete volumes in tunnelling cost during design phase.
摘要:A methodology was proposed for the design of micropiles to increase earth slopes stability. An analytic model based on bearn-colurnn equation and an existing P-y curve method was set up and used to find the shear capacity of the micropile. Then, a step-by-step design procedure for stabilization of earth slope with rnicropiles was introduced, involving six main steps: 1) Choosing a location for the rnicropiles within the existing slope; 2) Selecting micropile cross section; 3) Estimating length of rnicropile; 4) Evaluating shear capacity of mieropiles; 5) Calculating spacing required to provide force to stabilize the slope; 6) Designing the concrete cap beam. The application of the method to an embankment landslide in Qinghai Province was described in detail. In the final design, three rows of rnicropiles were adopted as a group and a total of 126 rnicropiles with 0.23 m in diameter were used. The micropile length ranged between 15 and 18 m, with the spacing 1.5 m at in-row direction. The monitoring data indicate that slope movement has been effectively controlled as a result of the slope stabilization measure, which verifies the reasonability of the design method.
摘要:A directive, legislated by the South African Department of Minerals and Energy(DME) in 1997, was introduced to reduce the dust exposures of continuous miner(CM) operators to below 5 mg/m3, when measured at the operator's cab position. The focus of this paper is to review the effectiveness of observing this rule for almost two decades and discuss industry perceptions arising from the application of this rule. The results have demonstrated that the engineering sample cannot predict the personal shift dust exposure of a CM operator. Therefore, it is recommended that the engineering sampling, as currently practiced,should be reviewed with the objective to discontinue and replace it by the approved PDM3700 realtime dust monitor.
摘要:The martensitic transformation temperature is the basis for the application of shape memory alloys(SMAs),and the ability to quickly and accurately predict the transformation temperature of SMAs has very important practical *** this work,machine learning(ML)methods were utilized to accelerate the search for shape memory alloys with targeted properties(phase transition temperature).A group of component data was selected to design shape memory alloys using reverse design method from numerous unexplored *** modeling and feature modeling were used to predict the phase transition temperature of the shape memory *** experimental results of the shape memory alloys were obtained to verify the effectiveness of the support vector regression(SVR)*** results show that the machine learning model can obtain target materials more efficiently and pertinently,and realize the accurate and rapid design of shape memory alloys with specific target phase transition *** this basis,the relationship between phase transition temperature and material descriptors is analyzed,and it is proved that the key factors affecting the phase transition temperature of shape memory alloys are based on the strength of the bond energy between *** work provides new ideas for the controllable design and performance optimization of Cu-based shape memory alloys.
摘要:We report the design of a novel multiband metamaterial bandpass filter (BPF) in the terahertz (THz)-wave region. The designed BPF is composed of a metal-dielectric-metal sandwiched structure with three nested rings on the top surface and a cross structure on the bottom surface. Full-wave simulation results show that the designed BPF has three transmission peaks at frequencies of 0.42, 1.27, and 1.86 THz with transmission rates of-0.87,-1.85, and-1.83 dB, respectively. Multi-reflection interference theory is introduced to explain the transmission mechanism of the designed triple-band BPF. The theoretical transmission spectrum is in good agreement with the full-wave simulated results. The designed BPF can maintain a stable performance as the incident angle varies from 0 to 30 for both transverse electric and transverse magnetic polarizations of the incident wave. The designed BPF can be potentially used in THz devices due to its multiband transmissions, polarization insensitivity, and stable wide-angle response in the THz region.
摘要:Most acceleration diagrams show high levels of unpredictability, as a result, it is the best to avoid using diagrams of earthquake acceleration spect~'a, even if the diagrams recorded at the site in question. In order to design earthquake resistant structures, we, instead, suggest constructing a design spectrum using a set of spectra that have common characteristics to the recorded acceleration diagrams at a particular site and smoothing the associated data. In this study, we conducted a time history analysis and determined a design spectrum for the region near the Lali tunnel in Southwestern Iran. We selected 13 specific ground motion records from the rock site to construct the design spectrum. To process the data, we first applied a base-line correction and then calculated the signal-to-noise ratio (]~SN) for each record. Next, we calculated the Fourier amplitude spectra of the acceleration pertaining to the signal window (1), and the Fourier amplitude spectra of the associated noise (2). After dividing each spectra by the square root of the selected window interval, they were divided by each other (1 divided by 2), in order to obtain the ~SN ratio (filtering was also applied). In addition, all data were normalized to the peak ground acceleration (PGA). Next, the normalized vertical and horizontal responses and mean response spectrum (50%) and the mean plus-one standard deviation (84%) were calculated for all the selected ground motion records at 5% damping. Finally, the mean design spectrum and the mean plus-one standard deviation were plotted for the spectrums. The equation of the mean and the above-mean design spectrum at the Lali tunnel site are also provided, along with our observed conclusions.
摘要:Aiming at the application of a wireless sensor network to locating miners in underground mine,we design a wireless sensor network location node system,considering the communication performance and the intrinsic safety. The location node system consists of a mobile node,several fixed nodes,and a sink node,all of whose circuits were designed based on CC2430. A varistor and a RC circuit were used in the reset circuit of a sensor node to guarantee the intrinsic safety by reducing discharge energy,the theoretical analysis of the discharge energy shows that the reset circuit is an intrinsic safety one. The analysis and simulation about the performance of the location node system are discussed,such as network communication delay and packet loss rate,the results show that the highest network communication delay of the system is about 0.11 seconds,and the highest packet loss rate is about 0.13,which assures the location node system has a high reliability,and can locate miners in the underground mine.
摘要:The dewatering of fine, flotation cleaned coals from Huaibei and Xuzhou (bituminous) and Yongcheng (anthracite) were studied. The supernatant and filter cake were examined to determine the rate and extent of flocculation and dewatering. A starch-based filter aid was used to increase flocculation and dewatering rates. The filtration constant, K, and compression index, s, of the Yongcheng slurry were measured under various conditions. A designed experiment was performed to determine optimum conditions for dewatering. The results showed that the filter aid enhanced flocculation and coagulation of the fine cleaned coal slurry, enhanced the structure of the filter cake and promoted dewatering of the cake. Moisture content in the cake was reduced to 17% after vacuum filtration.
摘要:Rockfalls are one of the hazards that may be associated with open pit mining. The majority of rockfalls occur due to the existing conditions of slopes, such as back break, fractures and joints. Constructing a berm on the catch bench is a popular method for the mitigation of rockfall hazards in open pit *** width of the catch bench and the height of the berm play a major role in the open pit bench ***, there is no systematic method currently available to optimize the size of these parameters. This study proposes a novel methodology which calculates the optimum catch bench width by integrating the rockfall simulation model and genetic algorithm into a Simulation-Optimization Model. The proposed methodology is useful when used to determine the minimum catch bench width, or the maximum overall slope angle, insuring that a sufficient factor of safety of the slope is included while maximizing the overall profitability of the open pit mine.
摘要:Aiming to resolve the technical problems of lower gas concentrations and a reduced effective drainage period caused by gas-drainage borehole fracture development, a flexible gel (FG) gas-drainage borehole sealing material was developed that adapts to borehole deformation. In this study, based on orthogonal tests, the effect of the ratio of material to water, stirring time and stirring speed on the viscosity, filtration property, water retention and pumpability of the FG were studied. The results indicate that the stirring speed, ratio of material to water and stirring time in turn increased the viscosity and the ratio of material to water, stirring time and stirring speed enhanced the filtration property and water retention. The FG pumps smoothly and achieves the optimal state of high water retention, low fluid loss and low viscosity when the ratio of material to water is 1:10, the stirring speed is 800 r/min, and the stirring time is 12 min. The field test results indicate that, after using the FG, the average drainage gas concentration increases by 25.9% and 27.6g and the average negative pressure of extraction increases by 2.7 kPa and 3.5 kPa com- pared with expansive cement and polyurethane, respectively.
地址:宁波市钱湖南路8号浙江万里学院(315100)
Tel:0574-88222222
招生:0574-88222065 88222066
Email:yzb@zwu.edu.cn